Which trade owns the roof interface?
A mechanical drawing may show a unit and curb without showing the completed membrane transition. Before demolition or equipment delivery, compare the roof plan with mechanical, electrical, structural, and architectural details. Record curb dimensions, support elevations, existing membrane, insulation, and the proposed tie-in. If a detail omits a termination bar, counterflashing, or compatible seal, resolve that gap before materials arrive.
We review how the roof layer meets each curb, pipe, conduit, skylight, wall, and equipment support. Confirm who removes the old flashing, who prepares the substrate, and who protects an open penetration between shifts. The penetration-flashing scope should identify the roof material and the closure detail, not only the equipment tag. Where a support or curb needs work, set the structural and roofing acceptance points before reset.
Make one coordination drawing that shows openings, staging, drains, and temporary closures. Give each detail a responsible trade and a release condition. A field change should reach the superintendent, roofer, and affected trade before the opening is cut. That short review can prevent an equipment crew from placing a unit over a tie-in that still needs inspection.