What should be confirmed before the site walk?
Identify the contracting officer or authorized representative, facilities lead, escort, safety contact, and who can answer scope questions. Verify personnel and vehicle entry requirements, roof access rules, approved staging, working hours, and the process for material delivery. Ask how the site handles submittals, daily briefings, questions, and field changes. Keep every scope clarification in the project’s designated record.
Request available roof drawings, prior repairs, leak reports, equipment limits, and any material or disposal requirements through the authorized channel. A roof inspection should report only conditions within the approved area and note where access was limited. Destructive testing or entry to a restricted zone requires separate approval, interior protection, and a planned closure detail.
Follow the current site instructions for escorts, badging, restricted areas, communication devices, photography, and records. Keep reports focused on authorized roof conditions; do not include unrelated operational or personal details. Confirm where images may be stored and who can receive them. If a route or escort changes, pause and use the revised instruction from the authorized contact.
Before lifting or staging material, confirm the ground area is approved and emergency routes remain open. Do not move vehicles, equipment, or property without the site lead’s direction. Work near communications or electrical systems requires approval from the system owner. The roof scope should name the responsible contractor for disconnection, protection, reset, and final interface inspection.